- Client: Jabatan Pengairan dan Saliran Sarawak
- Contract Sum: RM 19.80 million


Proposed Site Clearing and Earthwork for Kabong New Town Extension
- Client: LCDA Real Estate Sdn Bhd.
- Contract Sum: RM 8.03 million



- Client: Jabatan Pengairan Dan Saliran Sarawak
- Contract Sum: RM 5.15 million


- Client: Jabatan Kerja Raya Sarawak
- Contract Sum: RM 8.84 million
-
Proposed Kampung Segedup Extension, Kuching
- Client: Jabatan Tanah & Survei Sarawak
- Contract Sum: RM 33.81 million
Membina Jalan Kuala Mendalam Ke Meruyu Dan Kg. Kerangan Ma, Limbang
- Client: Jabatan Kerja Raya Sarawak
- Contract Sum: RM 4.51 million
-
Renovation Works at TABUNG HAJI Kuching, Sarawak
- Client: Lembaga Tabung Haji
- Contract Sum: RM 1.8 million
Propose Riverwall From Kpg Lintang to Tupong Kuching Division, Sarawak
- Client: Jabatan Pengairan dan Saliran Sarawak
- Contract Sum: RM 29.2 million
Client: Sarawak Digital Economy Corporation
Order Work
a. DESIGN AND SURVEY OF FIBER OPTIC CABLE WORKS (LINK: KG ANAK TUNO-KAMPUNG BATU DANAU)
b. SUPPLY AND ENGINEERING SERVICES, INSTALLATION, TESTING AND COMMISSIONING OF FIBER OPTIC CABLE WORKS (LINK: KG ANAK TUNO-KAMPUNG BATU DANAU)
c. DESIGN AND SURVEY OF FIBER OPTIC CABLE WORKS (LINK: KG LANGUBAN-SINDUMIN)
d. DESIGN AND SURVEY OF FIBER OPTIC CABLE WORKS (LINK: KG STAKONG, BUKIT BATU-TM BUKIT SIANG-SIANGT4400005)
e. DESIGN AND SURVEY OF FIBER OPTIC CABLE WORKS (LINK: KUALA BRIWAN-TRUSAN)
f. DESIGN AND SURVEY OF FIBER OPTIC CABLE WORKS (LINK: TM BUKIT SAGAN 2 – KG ANAK TUNO)
g. THE SUPPLY AND ENGINEERING SERVICES, INSTALLATION, TESTING AND COMMISSIONING OF FIBRE OPTIC CABLEWORKS. LINK: KG ANAK TUNO (SMART76120582) – KAMPUNG BATU DANAU (T3250107) (SACOFA)
h. THE SUPPLY AND ENGINEERING SERVICES, INSTALLATION, TESTING AND COMMISSIONING OF FIBRE OPTIC CABLE WORKS. LINK: TM BUKIT SAGAN 2 (T4350003) – KG ANAK TUNO (SMART76120582)
i. THE SUPPLY AND ENGINEERING SERVICES, INSTALLATION, TESTING AND COMMISSIONING OF FIBRE OPTIC CABLEWORKS. LINK: KG LANGUBAN (4.949994,115.526688) – SINDUMIN (SACOFA) (4.959796,115.503950)
j. DESIGN AND SURVEY OF FIBER OPTIC CABLE WORKS (LINK: SEB LACHAU SS CABINET – LACHAU KARA ROAD – SACOFA)
k. THE SUPPLY AND ENGINEERING SERVICES, INSTALLATION, TESTING AND COMMISSIONING OF FIBRE OPTIC CABLEWORKS. (LINK: SEB LACHAU SS CABINET – LACHAU KARA ROAD – SACOFA)
l. THE SUPPLY AND ENGINEERING SERVICES, INSTALLATION AND COMMISIONING OF FIBRE OPTIC CABLE WORKS. LINK: KG ANAK TUNO (JOINT) (4.633513, 114.898733) – TM LAST POLES (4.637845333, 114.9215228)
m. THE SUPPLY AND ENGINEERING SERVIES, INSTALLATION, TESTING AND COMMISSIONING OF FIBRE OPTIC CABLE WORKS. LINK: LONG BIDANG (LONG TALIS) (4.722963, 115.301216) – TM LAST POLES (4.775493485, 115.268040)
n. THE SUPPLY AND ENGINEERING SERVIES, INSTALLATION, TESTING AND COMMISSIONING OF FIBRE OPTIC CABLE WORKS. LINK: SEMBILING LIMBANG (4.71290700, 115.01244400) – TM LAST POLES (4.713438927, 115.0112045)
o. THE SUPPLY AND ENGINEERING SERVICES, INSTALLATION, TESTING AND COMMISSIONING OF FIBRE OPTIC CABLE WORKS. LINK: KG STAKONG (4.8389,115.342) – TM LAST POLES (4.847620475, 115.3559094)
p. DESIGN AND SURVEY OF FIBRE OPTIC CABLE WORKS (LINK: LONG BIDANG (LONG TALIS) – TM LAST POLES (4.77549, 115.2680402)
q. DESIGN AND SURVEY OF FIBRE OPTIC CABLE WORKS (LINK: KG ANAK TUNO (JOINT) – TM LAST POLES (4.63784533, 114.9215228)
r. DESIGN AND SURVEY OF FIBRE OPTIC CABLE WORKS (LINK: SEMBILANG, LIMBANG – TM LAST POLES (4.7134389, 115.0112045)
s. DESIGN AND SURVEY OF FIBRE OPTIC CABLE WORKS (LINK: KG LANGUBAN – TM LAST POLES (4.9504258, 115.5261309)
t. DESIGN AND SURVEY OF FIBRE OPTIC CABLE WORKS (LINK: KG STAKONG – TM LAST POLES (4.84762, 115.3559094)
-
Project: Penahan Hakisan Tebingan Sungai Di Kampung Sageng, Daerah Simunjan. Bahagian Samarahan
Client: Jabatan Pengairan dan Saliran Sarawak
- Contract Sum: RM 40.8 million